How To Form A Concrete Wall With Snap Ties
One piece ties are also called through ties because the rod extends through the wall and both form sides.
How to form a concrete wall with snap ties. The cones allow the snap tie to be broken off inside the concrete for surface patching. Concrete forming and accessories. The hex head allows short end snap ties to be broken back with the form work still in place. Insert the button end of a snap tie into each half inch drilled hole until the spreader cone hits the sheathing face.
Plastic cones or metal washers or pins are attached to these ties to use them as form spreaders and also to prevent water leakage from concrete. They are held in place by a snaptie wedge. Customer assistance form branch locations order status updates pod service request a quote return policy link your account. Ocm inc stsec 6hh 6 wall x 4 3 4 end hex head plastic cone snap ties can be used with either the 1 or 2 forming systems with 3 4 plywood.
Ocm inc hex head snap ties are manufactured with integral heads. Hold the sheet in place with a short 2x4 spacing block snap tie and c bracket placed toward the top of the panel and nail the bottom of the sheet to the joint cover wale. When properly fitted with cones or other they hold the wall forms at the proper distance to create the desired concrete wall thickness. Move to the back side of the concrete form where the buttons are sticking out.
They are held in place by a snaptie wedge or jahn bracket. Snap tie concrete forms are a simple and easy system for foundation walls. This snap tie forming method is used for retaining and standard walls batter walls bridges concrete signs footings etc. Tilt the form up and secure it at the location where you ll pour the concrete.
Set additional panels by nailing them to the joint cover wale and securing them to the previous panel with a small wood cleat. Clear all item label to go.