How To Install A Wall Mount Urinal
See how to connect the pipes and fittings to the ki.
How to install a wall mount urinal. Step 2 add the cold water line. Apply thread sealant tape to the pipe threads and install the female collar to the waste pipe. Attach the mounting board to the wall making sure that you install it so that all of the urinal fittings can be screwed it into this board. Directions for installing a urinal step 1.
A few tricks and tips to make your bathroom installation a whole lot easier. Urinal installation in home. Screw the nuts in until the face of the nuts are flush with the surface of the finished wall. The bottom is attached with lag screws through the slots in the china through the holes in the outlet connection into the finished wall.
The urinal is attached to the wall at the top with hangers that are screwed to the wall. It may be necessary to install a 2 x 6 boards behind the finished wall. Carefully position the urinal on the wall hangers. Place the backup nuts from the wall mount toilet kit onto the two lower closet carrier bolts and the bolt on the top left hand side.
Place the gasket onto the female collar with the beveled surface facing away from the collar. If you re one of those on the go guys who would prefer a urinal separate from a toilet then pay close attention to this video. Place the board between two board studs and then attach the edges of the board to the studs using some nails. Provide structural support directly behind the finished wall surface in the location where the urinal will be.
In this playback from way back.