How To Install Sliding Glass Door New Construction
Dry fit the assembled door frame in the opening to make sure everything fits.
How to install sliding glass door new construction. Set the bottom in place on the track in the door frame and then press the top portion of the door in place too. Tacoma wa 253 922 6030. Install the sliding glass panels and handle. If you have a knockdown not preassembled door frame assemble it on the deck garage floor or other flat surface.
Improper installation and care may void warranty. This is an overview of installing a patio door in a new construction opening. Sliding patio door with nail fin new construction disclaimer. Then have a friend help you lift the first section of the sliding door.
It is then attached using the nailing fin and integrated with the building wrap using flashing tape. Cover the foam insulation with trim and add a small amount of caulk to the visible joint between the trim and interior wall area. Caulk and install the new sliding door frame assemble the frame following the manufacturer s instructions. First carefully clean all debris from the rails to get a good fit.
New construction installation after building wrap for nail fin sliding doors a sliding door is installed on a stud wall with sheathing after the building wrap is in place. Use a putty knife to remove the excess after it dries. Use paintable silicone caulk around the exterior door casing. The manufacturer assumes no responsibility for failure performance or injury from.