How To Lay Roofing Felt In A Valley
Weave and cut the valley on the highest side of the roof.
How to lay roofing felt in a valley. Felt doesn t tear as easily so it s safer to walk on when you re working on steeper pitches. Step 1 prep work. Before laying roof felt all rotten decking must be replaced. Chalk lines should be snapped 33 5 8 above the eave line.
Start at the top. Lay the felt paper from the top of the roof valley to the eaves at the roof edge. You can center it and align it smoothly with the roof contours as you go down. Do not use felt as a temporary protection against rain.
Install new flashing metal flashing is often called drip edge along the. Using your staple gun secure the felt to the roof. Over driving nails is always a. Then your first shingle goes on the side you are going to cut.
Start by laying asphalt felt or other underlayment over the roof. When you reach the valley lay the shingles over the valley and trim the edges to the chalk line. If you live in an area with inclement weather you should consider using a special ice and water protector. How to install felt underlayment for a new roof.
Check to ensure the roof is in good enough condition to walk over. For most applications 15 lb. For an apex roof start at the bottom and lay it horizontal the next should overlap as in video so the water runs over the join as it runs off the roof finishing at the apex or top of roof. Overlap each row at least 3 to 4 inches.
The next one goes on the low side. Installing a roof is much more than just nailing shingles onto some boards. After this lines should be snapped every 34 as you move up the roof. Use a broad strip of felt paper.
The last layer should go over both sides of the roof overlapping both side covered in felt. If you need to temporarily protect a roof cover it with plastic sheeting or a tarp. Most roofing suppliers carry 15 lb. Nail down each valley shingle at least two inches 50 mm back from the chalk line.
Drip edges on the eaves any valley liners and all flashing should be installed before the tar paper is laid. When working with a helper expect to spend several hours to install drip edge wsu and roofing felt on a medium sized roof. Felt is laid on a flat roof to help keep the roofing system waterproof. Begin to install roof shingles on either roof face.
You want to lay the shingles from the bottom to the top of the valley. Start by overlapping a starter from both sides of the valley at the bottom. Felt paper should extend at least 10 inches up each side of the roof valley so use a strip between 20 and 24 inches wide. You can use a straight edge to achieve a straight cut.
Felt works just fine. While laying felt is not an easy job it can be done by anyone who has the patience to deal with it. Here are simple steps to get you started.