Install Gutter Under Drip Edge
It is put under the shingles of an attic to flow water directly into the gutter.
Install gutter under drip edge. A gutter apron is installed on the corners above roof decking. The roof leg should extend a minimum of 2 back onto the roof sheathing. The drip edge not only safeguards you from potential damages but it also preserves the appearance of your roof. Posted by everything gutter on sep 15 2015 in downspouts gutter cleaning gutter guards gutter repair gutter sagging ice dams leaky joints leaky seams new gutters seamless gutters seamless rain gutters comments off on does the gutter go under over or behind a drip edge.
If there s a drip edge installed where the fascia meets your shingles and the gutter is hung below the drip edge get some roll flashing and tuck it up under the drip edge and over the top of the gutter. While the vertical leg should be placed 1 4 1 2 away from the fascia. Make sure the outer edge extends over the gutter. A gutter apron is used where shingles are not far enough from the edge of the gutter.
Does the gutter go under over or behind a drip edge. So the rainwater flows into the gutter and out of it through downspouts attached along the wall and away from the house. To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first. How to install a drip edge slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
The gutter is installed right under the drip edge which is tilted purposely. While on the other hand a drip edge is installed to the trim and usually hangs directly behind the back of the gutter.