Install Metal Flashing On Siding
Run roofing felt up the wall about an inch higher than the wall side.
Install metal flashing on siding. Install roofing felt before starting step flashing. Step flashings on a cedar shake roof are typically installed every 10 inches. Flush the end of the flashing length with the wall corner and secure the flashing to the framing with an 8d nail at each wall stud. Nail it to the sidewall or glue it if nailing isn t possible.
I don t know of any way to detail or bend the j channel at the head so that the water it sheds at the ends doesn t drain into the wall cavity or behind the siding. Flashing can be purchased in pre formed styles to help you install it more easily and these include. Here are four ways to use metal flashing to prolong the life of siding. Vent pipe flashing as the name implies this flashing is usually.
You have to think about how roof shingles or feathers on a duck work to get a good understanding. If your house has a roof line that extends past a corner of two walls make the first piece of step flashing a corner. Install the trim just under the drip cap. To shed water and to facilitate the installation of the siding.
Next comes another layer of building wrap installed like the first layer. If the kick out and step flashing can t tuck behind the siding screw on cap flashing to cover it then caulk along the top. At the top tuck metal drip cap flashing under the siding and on top of the second layer of wrap. Test the rotted area of the t1 11 siding by poking it with a nail or a screwdriver.
It is always recommended to install step flashing behind stucco dryvit wood panel lap siding vinyl siding cedar shingle siding etc. Begin at either end of the wall and set the level middle section of the z flashing onto the top edge of the siding panel with the wider flange upward and against the wall framing. Apply a bead of caulk to the felt and set the window in the caulk. Lift the bottom shingle and slip in the kickout flashing.
If only the surface is damaged but the siding beneath is still solid you can install flashing. Slip in the flashing. Step flashing built to protect joints between roofs chimneys and other objects like skylights this flashing steps up above the shingles and attaches to the object providing comprehensive water protection. Cover with cap flashing.
Here s why the metal flashing is so important in your case. Inside corner w flashing. When it comes to flashing siding corners many builders simply use a 1x wood corner. Failing to replace step flashings when a cedar shake roof is replaced with a composition shingle roof.