Installing Firestone Epdm Over Existing Roof
Without the need for seam tape adhesives or waiting it installs 4 6x faster than standard epdm membrane including seams.
Installing firestone epdm over existing roof. After properly resting the epdm sheet is ready for installation. Can i install epdm membrane directly over an existing roof. Each installation phase is illustrated in the above manual with one or more 3 dimensional drawings. Fullforce epdm fullforce epdm is the only epdm membrane to feature a factory applied adhesive across its entire surface.
Osb3 or exterior grade plywood are both good deck materials for bonding the new. The two part drip trim consisting of a back plate that is nailed flush with the top of the roof deck. The membrane needs to be completely unfurled and laid flat over the roof surface. Roof edges pdf wall terminations pdf membrane repair pdf miscellaneous pdf for a complete overview of the installation specifications consult the epdm technical guidelines chapter 3 pdf.
Epdm should be bonded over 5 8 plywood 5 8 osb board or polyisocyanurate board with a fiberglass backing. The specification provided to us stated that we were to fully adhere epdm over the existing epdm after washing. These step by step installation instructions will assist professional installers to cover a roof with a firestone rubbercover epdm system in accordance with the high standards specified by firestone building products. You can install epdm membrane over an existing roof only if a new layer of 5 8 plywood 5 8 osb board or polyisocyanurate board with a fiberglass backing is used as a barrier to protect the epdm.
Rot if the existing roof deck and supporting timbers are rotten these will need to be removed and replaced. Then the rest phase begins which allows the rubber to expand naturally. The epdm membrane is then sandwiched between this a bead of mastic and the front trim which is finally nailed with stainless steel plastic topped pins to finish. We are certified by genflex sister company to firestone.
When you go fullforce you can get more squares installed in a day. On a warm day resting can take approximately 30 minutes.