Installing New Roof Drip Edge
Make sure the outer edge extends over the gutter.
Installing new roof drip edge. While the vertical leg should be placed 1 4 1 2 away from the fascia. The drip edge is nailed in place using 1 1 2 galvanized roofing nails. Once free slide the drip edge out and discard. Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Install the new drip edge as described above with cement and nails. The best way is to install the roof drip edge only along the eaves first then place ice and water barrier in the snowbelt or felt paper underlayment over the drip edge. On the eaves the peel and stick goes over the drip edge though there is some argument in the industry as whether this is the best way to install drip edge. Gently lift up the shingles on the edge of the roof and locate the nails holding the existing drip edge onto the roof.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first. You may need to nail through the starter strip into the drip edge. The common practice of installing drip edge tightly to the fascia creates a path for water to cling to the fascia and run down it wearing the face of the fascia and shortening its lifespan. 4 deep nail the drip edge to the sheathing every 16.
How to install a drip edge. You ll need to ask another roofing professional to hold up the shingles while you do so. Apply a continuous bead of cement along the top of the drip edge then press down on the shingle. Using drip edge with a nailing edge approx.
If it doesn t pull the drip edge out slightly from under the shingles. The roof leg should extend a minimum of 2 back onto the roof sheathing. On the rakes the drip edge goes over the membrane so the roofers apply the membrane first. Secure the drip edge with roofing cement.
How to install drip edge flashing to a new roof. Use a flat pry bar and hammer to pry the nails out of the drip edge gently.