Measure the size of your roof in square feet.
Installing tar paper on hip roof. Lay the next strip. Have a helper ready to assist with this step and take care to get the lines straight and clean. How to lay roofing felt on a hip roof. Position the first row of roofing felt flush on the bottom with the edge of the gutter apron.
Install the drip edge on the gable ends of the roof after you finish installing your underlayment. Then i run a r. Begin at the bottom edges of the roof and go up. Multiply the width by the height for the.
This is how i paper my vallies. Measure your roof s surface in square feet and purchase enough tar paper to cover the entire surface twice. Before applying roofing you ll need to cover the sheathing with roofing felt also often called tar paper most local codes call for using 30 pound felt. Adjust the felt as you roll it making sure that it s straight with no bubbling.
Staple it to the plywood with a staple gun placing the staples at 6 to 8 inch intervals along the edges and in the middle of the paper. Setting the roll and then nailing off. Measure the width and height of each section separately. Take a close look at how i paper the 30 in the center of the valley.
This video walks through the very basic steps for installing tarpaper felt. Nail it every couple of feet. Drip edges on the eaves any valley liners and all flashing should be installed before the tar paper is laid. Allow about 1 foot 0 30 m of the felt to hang over the hip.
Use a tin snips to cut the drip edge to size. Begin your first row of tar paper with the bottom of the tar paper. Unroll the paper on the roof and cut it to the correct length with a utility knife. Lay the first strip of tar paper side to side with its bottom.
How to install roofing tar paper. How to install roofing tar paper step 1. Chalk lines should be snapped 33 5 8 above the eave line. Roofing felt comes in rolls that feature pre marked lines 2 to 3.
I swear it is the fastest way out there. Some roofers prefer to attach felt underlayment with 1 inch roofing nails or special nails with plastic washers but most codes allow staples which are easier to drive. After this lines should be snapped every 34 as you move up the roof. Start at the bottom of one side of the roof at the right or left edge.
For hip type shed roofs which include slopes on all 4 sides begin at the square hip at the top of the roof. Use a ladder to reach the bottom level of the roof. Starting a roof with tarpaper felt.