Integral curb and gutter. Both the curb and gutter aggregates are placed at the same time. Curb and gutter types a b c and d curb and gutter types e and f curb and gutter transition type a to type c integral roll curb gutter and sidewalk single curb types a b and termination median nose transition joint for drainage inlets and manhole covers concrete pavers sidewalks curb modification at detectable warning curb ramps type a. 32 16 00 curbs and gutters. Curb typical curb section and typical taper section at nose of medians.
C 1 2017 2 integral p c c. C 1 2017 3 integral p c c. Curb gutter c 1 2017 1 p c c. Curb gutter for use at curb ramps only c 2 curb ramps c 2 2013 1 type 1.
Curbs and gutters shall be constructed of pcc conforming to subsection 201 i and 303 5. Unless otherwise shown on the typical cross sections the base aggregate and common excavation limits are 2 0 behind the back of curbs. Curb gutter. The integral curb and gutter alternate.
In the price bid for the type of curb or curb and gutter specified. Where integral curb and gutter is specified that portion of the curb below the upper surface elevation of the adjoining pavement shall be constructed by extending the pavement to the outer vertical plane of the curb at the time the pavement is placed. Joint 375mm 375mm 13 bars 450mm surface surface 400mm. Integral curb and gutter shall conform to the details shown for concrete curb and gutter including the transverse gutter slope.
32 cad drawings for category. 11 18 98 revised modified curb specify on plans variable variable 600mm min type e 1 300mm 100mm 6mm. The concrete used in this extension shall be the same composition as that of the pavement. Most curb is constructed separately from the pavement and the gutter is formed at the joint between the roadway and the curb.
Combined curb and gutter also called curb and channel has a concrete curb and gutter cast together in one piece. No payment will be extend 2 0 beyond the back of integral curb and gutter even if aggregate base when specified on typical cross sections shall. Curb and integral p c c. Integral curb is curbing constructed integrally as a part of a concrete pavement.
Tie bars are required for curb and gutters types a g k r and tbtt. Made for the additional aggregate base that is required to construct the grading section must be widened to do so. Weakened plane joints in curb and gutter shall conform to standard specifications for public works construction subsection 303 5 4 3 c or shall be i 112 inch deep sakuts.