Irc Attic Dead Load
Dead load 5 psf.
Irc attic dead load. International code council 42 in. The tabulated rafter spans assume that ceiling joists are located at the bottom of the attic space or that some other method of resisting the outward push of the rafters on the bearing walls. 11 04 2000 edition issued. The weight of the materials of construction incorporated into the building including but not limited to walls floors roofs ceilings stairways built in partitions finishes cladding and other similarly incorporated architectural and structural items and fixed service equipment.
Maximum ceiling joist spans. International residential code 2015 irc 2015. The minimum uniformly distributed live load shall be as provided in table r301 4. The material and component weights tables 1 3 and 1 4 may help builders correctly size.
Attic joists for live loads attic joists that are made from 2x8s may be acceptable for building your attic floor but because every room is variable there are no absolutes. Dead loads are defined by the code as follows. Flooring for dead loads may not be sufficient for live loads the loads created by people and the features of living space. Wide by 42 in high rectangle within plane of truss for two or more adjacent trusses top of required insulation roof trusses 24 in.
The load combinations in table 3 1 are recommended for use with design specifications based on allowable stress design asd and load and resistance factor design lrfd. Attic access hatch minimum 24 in. Calculating dead loads the prescriptive tables of the irc detailing continu ous footing sizes for conventional frame construction assume average weights of construction materials. Load combinations provide the basic set of building load conditions that should be considered by the designer.
Therefore additional calculations typically are not required. The international code council icc is a non profit organization dedicated to developing model codes and standards used in the design build and compliance process. International residential code chapter 3 building planning table r301 4 irc interpretation no.